Connectivity between us

Well-established connections are vital for communities
– whether it’s about connecting traffic or communication.

Rail tracks are important traffic connections, but “just” roads without asphalt
– first gravel so chippings and then rails are the main ingredients.
In addition, all the safety equipment – signs, lights and alarms.
Maintenance is usually done at night, to minimize traffic interference.
If there are multiple tracks it can be done during the day as well.

Connectivity could just be the tech between us.

Skriv et svar

Udfyld dine oplysninger nedenfor eller klik på et ikon for at logge ind:

WordPress.com Logo

Du kommenterer med din WordPress.com konto. Log Out /  Skift )

Google photo

Du kommenterer med din Google konto. Log Out /  Skift )

Twitter picture

Du kommenterer med din Twitter konto. Log Out /  Skift )

Facebook photo

Du kommenterer med din Facebook konto. Log Out /  Skift )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.